Mir Status Report 6 March 2001
Mission Control Center
TsNIIMash [Central Scientific Research Machine Building Institute]
Rosaviakosmos [Russian Aviation and Space Agency]
Moscow, Russia
Press release: March 06, 2001, 09:00 (Moscow time) [06:00 UTC]
The OC [Orbital Complex] “Mir” operations scheduled for March 05 are complete.
The station continues in free drift.
The recent telemetry data confirmed the OC “Mir’ remains sealed. The onboard
systems perform nominal, the Complex arrays generate enough electricity, the
thermal mode is normal.
Command complex was powered on and command software was entered in tne cause
of communication sessions, pressure was equalized in pneumatic and hydrobus
fuel tanks of the joint propulsion system of the core block of OC “Mir”.
The next status report is scheduled for March 7, 2001
*****
Trajectory report No 47
06.03.2001
(OC “MIR”)
Date: 06.03.2001
Flight orbitÝnumber (day): 86061(01)
Orbit period (in min): 89.584
Mean orbit altitude (km): 257.1
Daily average altitude decay (km): 2.0
Beta angle, i.e. the angle of the
Sun vector to the orbital plane (in degrees): +8.7
Duration of daylight (min): 53.4
Solar and geomagnetic activity current parameters:
solar F10.7 flux: 145
geomagnetic index Ap: 5
F10.7 <= 100 -- low level;
100 < F10.7 < 150 -- medium level;
F10.7 >= 150 — high level
Time of altitude Hav ~ 250 km:Ý10.03.2001 +1 day / -1 day
Re-entry prediction with consideration of
15% deviation fromÝsolar flux activity value: 27.03.2001 +5 days / -4 days
Date of the orbit parameters calculations: 05.03.2001