NASA Mars Odyssey THEMIS Images: March 17-21, 2014
– Delta Deposit (17 March 2014) http://themis.asu.edu/zoom-20140317a
– Wind Streaks (18 March 2014) http://themis.asu.edu/zoom-20140318a
– Alba Mons Flows (19 March 2014) http://themis.asu.edu/zoom-20140319158016a
– Tartarus Colles (20 March 2014) http://themis.asu.edu/zoom-20140320a
– Hebrus Valles (21 March 2014) http://themis.asu.edu/zoom-20140321a
All of the THEMIS images are archive here: http://themis.asu.edu/latest.html
NASA’s Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA’s Office of Space Science, Washington, D.C. The Thermal Emission Imaging System (THEMIS) was developed by Arizona State University, Tempe, in co.oration with Raytheon Santa Barbara Remote Sensing. The THEMIS investigation is led by Dr. Philip Christensen at Arizona State University. Lockheed Martin Astronautics, Denver, is the prime contractor for the Odyssey project, and developed and built the orbiter. Mission operations are conducted jointly from Lockheed Martin and from JPL, a division of the California Institute of Technology in Pasadena.