Status Report

NASA Mars Odyssey THEMIS Images: February 10-14, 2014

By SpaceRef Editor
February 20, 2014
Filed under , , ,
– Changing Winds (10 February 2014) http://themis.asu.edu/zoom-20140210a
 
– Dust Devil Tracks (11 February 2014) http://themis.asu.edu/zoom-20140211a
 
– More Dust Devils (12 February 2014) http://themis.asu.edu/zoom-20140212a
 
– More Dust Devils (13 February 2014) http://themis.asu.edu/zoom-20140213a
 
– North Polar Dunes (14 February 2014) http://themis.asu.edu/zoom-20140214a
 
All of the THEMIS images are archived here: http://themis.asu.edu/latest.html
 
NASA’s Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA’s Office of Space Science, Washington, D.C. The Thermal Emission Imaging System (THEMIS) was developed by Arizona State University, Tempe, in co.oration with Raytheon Santa Barbara Remote Sensing. The THEMIS investigation is led by Dr. Philip Christensen at Arizona State University. Lockheed Martin Astronautics, Denver, is the prime contractor for the Odyssey project, and developed and built the orbiter. Mission operations are conducted jointly from Lockheed Martin and from JPL, a division of the California Institute of Technology in Pasadena.

SpaceRef staff editor.