Status Report

NASA ISS On-Orbit Status 5 July 2013

By SpaceRef Editor
July 5, 2013
Filed under , , ,
NASA ISS On-Orbit Status 5 July 2013
NASA ISS On-Orbit Status 5 July 2013

New Status: Columbus (COL) Water Pump Assembly (WPA)-2 Remove & Replace (R&R) and Commissioning: On January 13, a Thermal Control System (TCS) WPA1 to WPA2 switchover activity was scheduled in support of Water On/Off Valve (WOOV) 1 & 2 periodic cycling. Troubleshooting was conducted but attempts to start WPA-2 were unsuccessful and COL has been operating on WPA-1 with no redundancy. Parmitano removed the faulty WPA-2 and replaced it with a new WPA delivered on ATV4. The newly-installed WPA was tested in a closed-loop configuration isolated from the Columbus ITCS loops and operated nominally. The crew reported difficulty installing acoustic insulation around the new WPA2 and were instructed to proceed with only the rear portion of the insulation installed. The new WPA2 is now integrated into the Columbus ITCS system and will be available as redundancy for WPA1 if needed after its commissioning is completed next week.

Advanced Resistive Exercise Device (ARED) Crank Handle Repair and Replace: Following completion of the exercise rope remove and replace on July 2, the crew reported that the crank handle was loose and one of the four fasteners had drifted from its witness mark. The crew tightened the 4 screws but the handle was still loose. Engineering teams recreated the problem on the ground and developed a repair plan which Cassidy successfully performed earlier this morning. ARED is now available for crew exercise.

Space Station Remote Manipulator System (SSRMS) Dynamic Onboard Ubiquitous Graphics (DOUG) Review: In preparation for next Tuesday’s EVA #22 robotics activities, FE-6 Nyberg set up the software and conducted a DOUG review. Following this activity, she participated in a conference with ground teams.

Synchronized Position Hold Engage and Reorient Experimental Satellites (SPHERES) Interact Experiment: Cassidy set up the work area to activate and check out the hardware and laptop computer. He then performed the 1st of 3 planned runs of the experiment followed by a conference with ground teams. Interact is an investigation developed by Supervision of Autonomous and Tele-operated Satellites (SATS) aimed at improving remote operation of space assets by enabling one user to control a team of multiple maneuvering satellites through a command and control user interface.

Countermeasures System (CMS) Periodic Fitness Evaluation (PFE): Cassidy and Parmitano performed their monthly PFEs with assistance from Nyberg as Crew Medical Officer (CMO). The evaluation is to monitor crewmembers’ overall fitness levels to ensure that cardiovascular and musculoskeletal health and performance is satisfactory. This is a graded exercise test on the Cycle Ergometer with Vibration Isolation and Stabilization (CEVIS).

Today’s Planned Tasks
– Periodic Fitness Evaluation – Nom Ops (subject) [Complete]
– IMS Conference [Complete]
– BAR Experiment Ops. r/g 2805 [Complete]
– Replacement of ИП-1 flow meters in SM. r/g 2808 [Complete]
– Periodic Fitness Evaluation – Nom Ops (assistance) [Complete]
– Periodic Fitness Evaluation – Nom Ops (subject) [Complete]
– Periodic Fitness Evaluation – Nom Ops (assistance) [Complete]
– ON MCC GO De-mate ИП-1 Flow Meter Telemetry Connectors. r/g 2808 [Complete]
– Installing ТВМ1-Н software version using RSS1 Laptop. r/g 2802 [Complete]
– CIR – Combustion Integrated Rack Hardware Review [Complete]
– ARED crank handle troubleshooting [Complete]
– COL-HDVCA2-HD [Complete]
– SSRMS-DOUG – Software Setup [Complete]
– WPA2 Return for Stowage in Columbus [Complete]
– WPA2 Retrieval and Transfer from Columbus [Complete]
– WPA2 R&R [Complete]
– BAR. Closeout Ops. r/g 2805 [Complete]
– SSRMS-DOUG – Review [Complete]
– ON MCC GO Mating ИП-1 Telemetry Connectors. r/g 2808 [Complete]
– Replacement of ИП-1 flow meters in SM (Closeout Ops) r/g 2808 [Complete]
– SSRMS-DOUG – Conference [Complete]
– SPHERES – Crew Conference with Payload Developer [Complete]
– SPHERES – Camera Setup and Test [Complete]
– P/TV-VTR – Configuration [Complete]
– MATRYOSHKA-R. BUBBLE-Dosimeter Retrieval And Readout / r/g 2807 [Complete]
– СТТС Configuration for MRM2 [Complete]
– SM Ventilation System Preventive Maintenance. [Complete]
– Kulonovskiy Kristall Experiment. r/g 2803 [Complete]
– COL-HDVCA2-HD – Deactivation of Video Camera [Deferred]
– CIR – Rack Doors Open [Complete]
– CIR – Combustion Chamber Front Rack Door Open [Complete]
– Retrieval of Radi-N dosimeters from deployed locations [Complete]
– MRM2 Comm Reconfig for Nominal Ops [Complete]
– KULONOVSKIY KRISTALL. Copy and Downlink Data via РСПИ / r/g 2803
– MDCA One Fuel Reservoir Replacement and Video Recording [Complete]
– RADIN – Radiation Dosimetry Inside ISS-Neutrons Hardware Handover from Russian Crew [Complete]
– MATRYOSHKA-R. Handover of BUBBLE-dosimeter detectors from USOS. r/g 2807 [Complete]
– MATRYOSHKA-R. BUBBLE-Dosimeter Gathering and Measurements r/g 2807 [Complete]
– SPHERES – Camera Setup and Test [Complete]
– СОЖ Maintenance [Complete]
– IDENTIFICATION. Copy ИМУ-Ц micro-accelerometer data to laptop / r/g 1813 [Complete]
– WHC Pretreat Tank R&R [Complete]
– CIR – Combustion Chamber Front Door Closing and Video Recording [Complete]
– SPHERES – Hardware Shutdown and Battery Check [Complete]
– CIR – Bottle Replacement [Complete]
– IMS and Stowage Conference [Complete]
– SEINER Ocean Observations / r/g 2804
– CIR – Rack Doors Close [Complete]
– SHD – Weekly Questionnaire [Complete]
– Daily Planning Conference (S-band) [Complete]
– Flight Director / ISS Crew Tagup [Complete]

Task List
– CEO Ops [Complete]
– IMS edit
– WHC KTO replace
– WHC EDV R&R
– Roscosmos Report
– Uragan Photo
– Econ Photo
– CMS ARED Vlv mark [Complete]
– EMU SAFER practice
– AC dry vac config [Complete]
– EMU photo take [Complete]
– FFTD Find Part 2 [Complete]
– Trash report [Complete]

Ground
– Nominal Commanding

Three-Day Look Ahead:
Saturday, 7/06: Crew off duty
Sunday, 7/07: Crew off duty
Monday, 7/08: USOS half duty day, EVA prep activities, EarthKam setup

QUICK ISS Status – Environmental Control Group:

Component – Status
Elektron – On
Vozdukh – On
[СКВ] 1 – SM Air Conditioner System (“SKV1”) – On
[СКВ] 2 – SM Air Conditioner System (“SKV2”) – Off
Carbon Dioxide Removal Assembly (CDRA) Lab – Standby
Carbon Dioxide Removal Assembly (CDRA) Node 3 – Operate
Major Constituent Analyzer (MCA) Lab – Off
Major Constituent Analyzer (MCA) Node 3 – Operate
Oxygen Generation Assembly (OGA) – Process
Urine Processing Assembly (UPA) – Standby
Trace Contaminant Control System (TCCS) Lab – Off
Trace Contaminant Control System (TCCS) Node 3 – Full up

SpaceRef staff editor.