International Space Station (ISS) Management Center (IMC) Daily Summary Report
Increment 36 Operations – Stage 36-6
06/14/13 4:00 pm Central Daylight Time (CDT)
165/21:00 Greenwich Mean Time (GMT)

New Status: Off duty day for USOS Crew: Today was an off duty day for Flight Engineer (FE)-3 Cassidy, FE-5 Parmitano, and FE6 Nyberg as compensation for supporting tomorrow’s ATV4 operations. ATV4 is scheduled to dock tomorrow, Saturday June 15th at 8:46 am CST.

Biological Rhythms: Nyberg terminated her first 24-hour Biological Rhythm measurement and exchanged the multimedia card and battery on the Digital Walk Halter Electrocardiogram. After exchanging the multimedia card and battery, Nyberg initiated a second 24 hour recording session. The investigation examines the circadian variations in the cardiac autonomic function during space flight. Results aim to improve crew health technology on long-duration space flights.

Environmental Health System (EHS) Acoustic Dosimeter Setup: Parmitano set up and donned a crew-worn acoustic dosimeter which he will wear for 24 hours. Acoustic data collected by the dosimeter will be downlinked to the ground for analysis.
Robotic Operations: Overnight, Robotics Ground Controllers attempted to move Cargo Transportation Container (CTC)5 from ExPRESS Logistics Carrier (ELC) 3 to External Stowage Platform (ESP) 2. CTC5 was released from ELC3 and maneuvered to ESP2, at which point two issues became evident. The side of CTC5 facing the adjacent Direct Current Switching Unit (DCSU) on ESP2 has handrails with clearances that were tighter than expected. In addition, the DCSU located on ESP2 has a thermal cover with fabric loops that could interfere with CTC5. The decision was made to return CTC5 to ELC3 and re-install it while ground teams review forward plans.

Today’s Planned Tasks
– PLAZMENNIY KRISTALL. Pressure Check [Complete]
– Audio Dosimeter Preparation [Complete]
– Activation and inspection of Orlan suits No. 5 and 6 [Complete]
– ИК0501Gas Analyzer О2 readings adjustments. [Complete]
– DC1 БСС (Spacesuit Interface Unit) Checkout [Complete]
– ПхО БСС (Spacesuit Interface Unit) Checkout [Complete]
– Spacesuit Replaceable Elements Ops / Orlan-MK [Complete]
– Battery replacement and start of first measurement [Complete]
– Battery Installation in Orlan Telemetry Unit (БРТА) [Complete]
– ISS Crew and ГОГУ (RSA Flight Control Team Management) Weekly Conference [Complete]
– СОЖ Maintenance [Complete]
– Replacing filters in FGB ПС1, ПС2 Dust Collectors [Complete]
– Reflect changes in IMS / FGB Systems Operation [Complete]
– DC1 EVA Support Panel (ПОВ) Test. [Complete]
– ПхО EVA Support Panel (ПОВ) Test. [Complete]
– OBSTANOVKA. Download of Obstanovka P/L Data from БСПН to RSS1 [Complete]
– Testing КВД (Pressure Equalization Valve) from DC1 ПОВ / EVA from DC, Orlan-MK [Complete]
– Testing КВД (Pressure Equalization Vlv) from ПхО ПОВ (ПхО EVA Support Panel) [Complete]
– RS Equipment prep for first ATV ingress
– СGBA – Status check [Complete]
– On-orbit Hearing Assessment using EARQ
– MATRYOSHKA-R. Monitoring Tritel Readings [Complete]
– Comm config to support voice comm from MRM2 during the experiment [Complete]
– Initiate EMU LLB Battery Autocycle [Complete]
– Weekly Housekeeping [Complete]
– PLAZMENNIY KRISTALL Hardware Activation and Experiment Start [Complete]
– TV-ISS-MCC. PLAZMENNIY KRISTALL. Check TV signal on ВКУ Monitor [Complete]
– TV-MPEG2 (Ku-band) Start NASA MPEG2 Viewer on SSC ЦП [Complete]
– Consolidation of Tool Kits for EVA-33, Photography [Complete]
– PLAZMENNIY KRISTALL. Hardware deactivation [Complete]
– OBSTANOVKA. Download of Obstanovka P/L Data from БСПН to RSS1 [Complete]
– Handover of Ethernet MLM cable (W5946) from ТКГ 418 (from RS to USOS) [Complete]
– Flight Director / ISS Crew Tagup [Complete]
– ECON-M. Observations and Photography [Complete]
– URAGAN Observations and Photography [Complete]
– Preparation of reports for Roskosmos site [Complete]

Task List
– CMS-BD-2 HARNESS CHK
– CMS-GLENN BD-2 CHK
– EVA-AUDIT-TRASH [Complete]
– EVA-on orbit measure
– Wanted poster for EVA Connector Insulating Sleeve [In Work]
– SSC5-PHOTO
– AMINE H/W Locate [Complete]

Ground
– Nominal Commanding

Three-Day Look Ahead:
Saturday, June 15: ATV4 Docking, Capillary Channel Flow
Sunday, June 16: BCAT, Weekly Cleaning
Monday, June 17: ATV Initial Ingress, Surface Telerobotics, MT Translate (WS6 to WS5)

QUICK ISS Status – Environmental Control Group:
Component – Status
Elektron – On
Vozdukh – On
[СКВ] 1 – SM Air Conditioner System (“SKV1”) – On
[СКВ] 2 – SM Air Conditioner System (“SKV2”) – Off
Carbon Dioxide Removal Assembly (CDRA) Lab – Standby
Carbon Dioxide Removal Assembly (CDRA) Node 3 – Operate
Major Constituent Analyzer (MCA) Lab – Off
Major Constituent Analyzer (MCA) Node 3 – Operate
Oxygen Generation Assembly (OGA) – Process
Urine Processing Assembly (UPA) – Standby
Trace Contaminant Control System (TCCS) Lab – Off
Trace Contaminant Control System (TCCS) Node 3 – Full Up

Meeting Schedule: Meeting Day Date Houston Time (CDT)
IMMT Monday June 17 8:00 a.m.
IMMT Thursday June 20 8:00 a.m.