NASA ISS On-Orbit Status 4 June 2013
International Space Station (ISS) Management Center (IMC) Daily Summary Report
Increment 36 Operations – Stage 36-6
06/04/13 4:00 pm Central Daylight Time (CDT)
155/21:00 Greenwich Mean Time (GMT)
New Status: Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) R&R: Flight Engineer (FE)-5 Parmitano and FE-6 Nyberg removed the expired TOCA Protoflight Unit (PFU1) from the Water Recovery System (WRS) 1 rack face and installed a new TOCA PFU2. Nyberg then conducted a WRS sample analysis, recorded the data and transferred it to the Ground.
Z1 Dome Stowage Activities: Parmitano and Nyberg cleared stowage from the Node 1 overhead to access Z1. Parmitano removed items that are needed for the upcoming USOS Extravehicular Activities (EVAs), currently scheduled for July 2013, as well as items to be trashed or returned. Following the removal of hardware, cargo not required for near-term operations was transferred and stowed in the Z1 dome, as ingress only occurs every few years.
Binary Colloidal Alloy Test – Canada 1 (BCAT-C1): FE-3 Cassidy unstowed the slow growth sample module, installed it on a flat surface and pre-mixed a sample for an as yet to be determined future run of the experiment. The BCAT-C1 experiment studies nano-scale particles dispersed in liquid, known as a colloidal suspension, commonly found in such commercial commodities as paint, electronic polishing compounds and food products. These suspensions have the unique property that the particles phase separate (like oil and water) and the particles self-assemble into crystals that interact strongly with light (like opal). Photographing these samples in microgravity allows the measurement of these processes while avoiding the effects of particle sinking due to gravity. This study allows the development of new insights into this important material process.
Today’s Planned Tasks
– PROK – Urine Sample Collection [Complete]
– Daily Planning Conference (S-band) [Complete]
– BAR. Terminate Pyren Charge/ r/g 2038 [Complete]
– Replacement of СА-325 Unit on Regul-OS Work Station 1 – start. r/g 2506 [Complete]
– URAGAN. Photo Spectral System Battery Charge (begin) / r/g 2437 [Complete]
– CIR – Upper Rack Doors Opening and Video Recording [Complete]
– BAR. Experiment Ops. Tagup with specialists (S-band) / r/g 2527 [Complete]
– TOCA Ops [Complete]
– CIR – Manifold Bottle Removal and Replacement [Complete]
– ON MCC GO Demating БИТС2-12 telemetry connectors from СА-325 monoblock r/g 2506 [Complete]
– Replacement of СА-325 on Regul-OS Work Station 1. r/g 2506 [Complete]
– CIR – Upper Rack Doors Close [Complete]
– Crew time for ISS adaptation and orientation [In work]
– TOCA Ops [Complete]
– Crew time for ISS adaptation and orientation
– OBSTANOVKA, BTN-NEUTRON r/g 2529 [Complete]
– 24-hour BP monitoring (start) / r/g 2526 [Complete]
– Life On The Station Photo and Video / r/g 2414 [Complete]
– WRS Water Sample Analysis [Complete]
– ON MCC GO Mating ЕКТС Telemetry Connectors to СА-325. r/g 2506 [Complete]
– АОК ГАНК-4М data readout [Complete]
– Replacement of СА-325 on Regul-OS work station 1 – Closeout Ops. r/g 2506 [Complete]
– VIZIR. Experiment Ops / r/g 2534 [Complete]
– БД-2 Exercise – Day 4 [Complete]
– Terminate EMU METOX Regeneration [Complete]
– Air Heater Fan (БВН) Screen Cleaning in ТК 708 [Complete]
– MELFI – Refrigerator external inspection [Complete]
– PROK – Diet Log ops [Complete]
– TOCA 2 Data Recording [Complete]
– Node 1 Overhead Cargo Transfers [Complete]
– PAO Video / r/g 2514 [Complete]
– Hatch opening to Z1 [Complete]
– Crew Prep for PAO [Complete]
– Test Water Separation using Membrane Filter-Separator (МФР) / r/g 2512
– PAO Hardware Setup [Complete]
– PAO Event [Complete]
– TVIS Hardware Handover [Complete]
– Z1 – Cargo Ops [Complete]
– ARED Vibration Isolation and Stabilization (VIS) Rail Greasing [Complete]
– БД-2 Exercise – Day 1 [Complete]
– Harmful Contaminant Measurements in SM / r/g 1955 [Complete]
– BCATC1 – Sample Mixing [Complete]
– Closing Node 1 Z1 hatch [Complete]
– БД-2 Exercise – Day 4 [Complete]
– IMS Update [Complete]
– Space Headaches – Daily Questionnaire [Complete]
– Node 1 Overhead Cargo Relocations [Complete]
– СОЖ Maintenance [Complete]
– Daily Planning Conference (S-band) [Complete]
– HAM Radio Session with Belorus State University Students / r/g 2525
– BAR Pyren Charging Start / r/g 2038 [Complete]
Task List
– IMS edit
– CEO ops
– Crew handover [Active]
– WHC-KTO Replace
– US PIP audit
– Preparation of reports for Roskosmos site
– ECON-M. Observations and Photography
– URAGAN Observations and Photography
Ground
– Nominal Commanding
Three-Day Look Ahead:
Wednesday, 6/05: ATV4 launch, Ocular Health activities, MSPR CC leak check, Fundoscope ops
Thursday, 6/06: Ultrasound/cardiac ops, Node 3 HD Encoder install, MSPR Leak Checks
Friday, 6/07: 51P stow, RS EVA Prep, Microbiome
QUICK ISS Status – Environmental Control Group:
Component Status
Elektron – On
Vozdukh – On
[СКВ] 1 – SM Air Conditioner System (“SKV1”) – On
[СКВ] 2 – SM Air Conditioner System (“SKV2”) – Off
Carbon Dioxide Removal Assembly (CDRA) Lab – Standby
Carbon Dioxide Removal Assembly (CDRA) Node 3 – Operate
Major Constituent Analyzer (MCA) Lab – Off
Major Constituent Analyzer (MCA) Node 3 – Operate
Oxygen Generation Assembly (OGA) – Process
Urine Processing Assembly (UPA) – Standby
Trace Contaminant Control System (TCCS) Lab – Off
Trace Contaminant Control System (TCCS) Node 3 – Full Up