NASA ISS On-Orbit Status 28 May 2013
NASA ISS On-Orbit Status 28 May 2013

International Space Station (ISS) Management Center (IMC) Daily Summary Report
Increment 36 Operations – Stage 36-3
05/28/13 11:25 pm Central Daylight Time (CDT)
149/4:25 Greenwich Mean Time (GMT)

There will not be an ISS IMC Daily Summary Report sent on Wednesday, May 29 due to the crew sleep shift day. ISS IMC Daily Summary Reports will resume on Thursday, May 30.

New Status: Multi-Purpose Small Payload Rack (MSPR) Combustion Chamber (CC) Setup: FE-3 Cassidy configured and installed the MSPR CC in preparation for the Combustion Chamber gas leak check scheduled for Thursday, May 30. Cassidy deployed and installed the chamber onto the MSPR workbench and then installed the chamber in the MSPR work volume. The leak check is comprised of three tests – Nitrogen gas (GN2) supply line leak check, CC leak check with negative pressure, and CC leak check with positive pressure. The GN2 and negative pressure leak checks are scheduled for Thursday, May 30.

35 Soyuz (35S) Launch and Docking: Following their morning work, ISS Commander (CDR) Vinogradov, Flight Engineer (FE)-2 Misurkin, and Cassidy were scheduled for a four-hour nap in advance of the docking of 35S. FE-4 Yurchikhin, FE-5 Parmitano, and FE-6 Nyberg launched on 35S from the Baikonur Cosmodrome at 3:31 pm CDT. 35S proceeded through a nominal four-orbit rendezvous and docked to the MRM1 docking port at 9:10 pm CDT, returning the ISS to a full 6-crew complement. Following docking and hatch opening, the entire crew participated in a welcome ceremony and a safety briefing.

Today’s Planned Tasks
– Biochemical urine test [Complete]
– Biochemical urine test [Complete]
– URISIS h/w stowage [Complete]
– Check & report ВКС laptop anti-virus scan results / r/g 1930 [Complete]
– Setup USOS PAO h/w [Complete]
– ISS – Baikonur SG-2 comm check [Complete]
– ТВ(Б-Ц). PAO event with a delegation from Orel (Ku+S-band) / r/g 2452 [Complete]
– Stow returnable equipment in Progress 419 (SM aft) [Complete]
– Comm configuration for conference out of MRM2 [Complete]
– COULOMBIC CRYSTAL. Experiment run. r/g 2462 [Complete]
– Close USOS window shutters [Complete]
– IMS update [Complete]
– COULOMBIC CRYSTAL. Data preparation and downlink via РСПИ / r/g 2462 [Complete]
– MSPR – combustion camera setup [Complete]
– MRM2 comm reconfiguration back to nominal [Complete]
– VZAIMODEYSTVIYE. Experiment run / r/g 2370 [Complete]
– On MMC Go ISS air repress from Progress 419 СРПК Section 2 (SM aft) (start) [Complete]
– OBSTANOVKA, r/g 2469 [Complete]
– VZAIMODEYSTVIYE. Experiment run / r/g 2116 [Complete]
– ISS air repress from Progress 419 СРПК Section 2 (SM aft) (end) [Complete]
– Sleep-Shift Nap [Complete]
– DPC r/g 2403 [Complete]
– Familiarization with TV report procedure about hatch opening [Complete]
– SSC prep for the upcoming crew 35S [Complete]
– Replace urine collector (МП) and filter insert (Ф-В) АСУ [Complete]
– HAM radio equipment deactivation [Complete]
– Tools preparation for physical exercises for arriving crew [Complete]
– USOS windows’ shutters closure [Complete]
– Gas analyzer activation in Soyuz 708 [Complete]
– ARED – flywheel cylinder evacuation [Complete]
– MATRESHKA-Р. “Lulin-5” data monitoring / r/g 2096 [Complete]
– Start application NASA MPEG2 Viewer and monitor TV signal on Laptop SSC CP [Complete]
– Communication equipment configuration before Soyuz #709 docking to МRМ1 [Complete]
– Printout greetings for the new crew [Complete]
– Preparation for Soyuz #709 docking [Complete]
– Switch “Elektron” system to 24А mode [Complete]
– Start application NASA MPEG2 Viewer and monitor TV signal on Laptop SSC CP [Complete]
– Photo and video shooting of life on ISS / r/g 2414 [Complete]
– Monitoring of Soyuz #709 approach to ISS [Complete]
– Switch PEV MRM1-Soyuz to position ELECTICAL CONTROL (ЭЛЕКТ УПР) [Complete]
– ТВС SМ deactivation [Complete]
– Soyuz #709 – МRМ1 interface leak check [Complete]
– Communication reconfiguration back to nominal after Soyuz #709 docking [Complete]
– Stop application on laptop SSC ЦП [Complete]
– IDENTIFIKATSIA Copy measurements results of ИМУ-Ц experiment on laptop [Complete]
– Switch “Elektron” system to 32А mode [Complete]
– КСПЭ equipment preparation for TV reports of hatch opening from МRМ1 and “ISS-36 arrival” from SM [Complete]
– Soyuz – МRМ1 transfer hatches opening [Complete]
– ТV(Б-Ц). TV-report “ISS-36”
– Space suit and gloves stowage to temporary location
– TV system (ТВС) deactivation after TV reports of hatch opening from МRМ1 and “ISS-36 arrival”
– Ham radio equipment activation
– Safety briefing
– Soyuz #709 deactivation (without ГА gas analyzer deactivation )
– SHD1ST. Headache daily questionnaire entry
– Crew quarters preparation
– Photography of СтА docking probe trace on acquisition cone of passive assembly / r/g 9763
– Soyuz 709 docking video downlink from CP SSC laptop (ОСА)
– USOS window shutters close
– Downlink of P/TV of internal surface of the docking cone to OCA
– Cargo transfer from Soyuz 709, IMS update / r/g 2467

Task List
– 35S USOS Unstow/Unpack
– Node 2 Spare Tools Audit [Complete]
– IMV Flow Measurements
– IMS Edit
– WHC KTO Replace
– WHC ЕДВ R&R
– Preparation of reports for Roskosmos site / r/g 0484
– РСПИ. Photo-Video Data Prep on RSS2 for Downlink via РСПИ / r/g 2003
– URAGAN Observations and Photography / r/g 2422
– ECON-M. Observations and Photography

Ground
– MNVR to -XVV TEA using Optimal Propellant Maneuver (OPM) [Complete]
– MNVR to +XVV using OPM
– Nominal Commanding

Three-Day Look Ahead:
Wednesday, May 29: Sleep shift
Thursday, May 30: MSPR, BASS, IWIS setup for БД-2
Friday, May 31: IMV Flow Measurements, Gradient Heating Furnace, Emergency Roles and Responsibilities

QUICK ISS Status – Environmental Control Group:
Component Status
Elektron – On
Vozdukh – On
[СКВ] 1 – SM Air Conditioner System (“SKV1”) – Off
[СКВ] 2 – SM Air Conditioner System (“SKV2”) – Off
Carbon Dioxide Removal Assembly (CDRA) Lab – Operate
Carbon Dioxide Removal Assembly (CDRA) Node 3 – Standby
Major Constituent Analyzer (MCA) Lab – Off
Major Constituent Analyzer (MCA) Node 3 – Operate
Oxygen Generation Assembly (OGA) – Standby
Urine Processing Assembly (UPA) – Standby
Trace Contaminant Control System (TCCS) Lab – Off
Trace Contaminant Control System (TCCS) Node 3 – Full Up