NASA ISS On-Orbit Status 23 May 2013

By SpaceRef Editor
May 23, 2013
Filed under , , ,
NASA ISS On-Orbit Status 23 May 2013
NASA ISS On-Orbit Status 23 May 2013

International Space Station (ISS) Management Center (IMC) Daily Summary Report
Increment 36 Operations – Stage 36-3
05/23/13 4:00 pm Central Daylight Time (CDT)
143/21:00 Greenwich Mean Time (GMT)

New Status: Russian Treadmill (БД-2) Checkout: Flight Engineer (FE)-2 Misurkin performed checkout of the new Russian treadmill. The crew was able to run on the БД-2 and downlinked photos and a video of the session to ground specialists for evaluation. The crew is scheduled to start nominal exercise sessions on Friday.

Synchronized Position Hold, Engage, Reorient, Experimental Satellites (SPHERES) Zero Robotics: FE-3 Cassidy performed a SPHERES Zero Robotics session in preparation for the August Zero Robotics Middle School final competition. The SPHERES Zero Robotics program provides middle and high school students the opportunity to develop algorithms for SPHERES and to design software to accomplish complex tasks in space such as docking, assembly and formation flight.

Backup Control Center (BCC) Internet Protocol (IP) Phone Test: In preparation for the start of Houston’s hurricane season on June 1, Cassidy attempted to perform an IP Phone Test with the BCC Flight Control Team at the Huntsville Operations Support Center (HOSC) but was unsuccessful. This is a new capability added to BCC this year. Ground teams are working this issue.

Today’s Planned Tasks
– Backup Control Center IP Phone Test [Complete]
– Daily Planning Conference (S-band) [Complete]
– СТТС Configuration for MRM2 [Complete]
– SPHERES Payload Review [Complete]
– RELAKSATSIYA. Complete battery charge for the Relaksatsiya Experiment / r/g 1845 [Complete]
– KULONOVSKIY KRISTALL. Hardware Setup and Configuration / r/g 2423 [Complete]
– SPHERES – Payload Conference [Complete]
– SPHERES – SSC Transfer to JPM [Complete]
– СОЖ Maintenance
– SPHERES Test Setup [Complete]
– Kulonovskiy Kristall Experiment Ops / r/g 2423 [Complete]
– RELAKSATSIYA. Hardware Setup and Parameter Adjustment / r/g 2427 [Complete]
– Comm reconfig in MRM2 for Nominal Ops [Complete]
– SPHERES Test [Complete]
– KULONOVSKIY KRISTALL. Copy and Downlink Data via РСПИ / r/g 2423 [Complete]
– RELAKSATSIYA. UV Storm Emission Observation. / r/g 2427 [Complete]
– RELAKSATSIYA Closeout and hardware stow / r/g 2427 [Complete]
– Preparation for КЛ-108/109Ц removal and connection of КЛ-108А in SM / r/g 2425 [Complete]
– Removal of КЛ-108/109Ц and Connection of КЛ-108А in SM / r/g 2425 [Complete]
– SPHERES Test Shutdown [Complete]
– Mate КЛ-108А Telemetry Connectors / r/g 2425 [Complete]
– SPHERES – SSC Relocation from JEM to stowage [Complete]
– Removal of КЛ-108/109Ц and Connection of КЛ-108А in SM / r/g 2425 [Complete]
– VIRU. БД Log Sheet Fill out and Downlink / r/g 2426 [Complete]
– PAO Hardware Setup [Complete]
– Crew Prep for PAO [Complete]
– PAO Event [Complete]
– WSТА Fill [Complete]
– ИП-1 Flow Sensor Position Verification r/g 1550 [Complete]
– PAO Hardware Setup [Complete]
– CWC Audit [Complete]
– Crew Prep for PAO r/g 2433 [Complete]
– AQM – Power Cycling [Complete]
– TV-ISS-MCC. TV Greetings r/g 2433 [Complete]
– FGB ЦВ1 Fan Grille Cleaning [Complete]
– БД-2 Test after Installation on RS r/g 2431, 2432 [Complete]
– БД-2 Test Video Recording / r/g 2431, 2432 [Complete]
– RGN REC-TNK – Remove depress hose for nominal operations [Complete]
– БД-2 Exercise Procedure Review / r/g 2407, 2431 [Complete]
– Daily Planning Conference (S-band) [Complete]
– P/TV Playback Start
– USOS Window Shutter Close
– P/TV Playback Stop

Task List
– URAGAN Observations and Photography / r/g 2422
– РСПИ. Photo-Video Data Prep on RSS2 for Downlink via РСПИ / r/g 2003
– Preparation of reports for Roskosmos site / r/g 0484
– ECON-M. Observations and Photography
– CEO Observations [Complete]
– WHC KTO Replace
– N2 Spare Tools Audit
– D3 Camera Sensor Cleaning [In Work]
– IMV Flow Measurements

Ground
– Nominal Commanding [Complete]
– Cupola Window Heater Test [In Work]

Three-Day Look Ahead:
Friday, May 24: Seedling Growth sample process, EXPRESS 3 Laptop Software Load
Saturday, May 25: Weekend off duty
Sunday, May 26: Weekend off duty

QUICK ISS Status – Environmental Control Group:
Component Status
Elektron – On
Vozdukh – On
[СКВ] 1 – SM Air Conditioner System (“SKV1”) – Off
[СКВ] 2 – SM Air Conditioner System (“SKV2”) – Off
Carbon Dioxide Removal Assembly (CDRA) Lab – Operate
Carbon Dioxide Removal Assembly (CDRA) Node 3 – Standby
Major Constituent Analyzer (MCA) Lab – Off
Major Constituent Analyzer (MCA) Node 3 – Operate
Oxygen Generation Assembly (OGA) – Operate
Urine Processing Assembly (UPA) – Standby
Trace Contaminant Control System (TCCS) Lab – Off
Trace Contaminant Control System (TCCS) Node 3 – Full Up

Meeting Schedule:
Meeting Day Date Houston Time (CDT)
IMMT – Monday May 27 CANCELLED
IMMT – Thursday May 30 8:00 a.m.