Status Report

NASA ISS On-Orbit Status 28 August 2011

By SpaceRef Editor
August 29, 2011
Filed under , , ,
NASA ISS On-Orbit Status 28 August 2011

All ISS systems continue to function nominally, except those noted previously or below. Sunday – Crew off-duty day. Ahead: Week 24 of Increment 28

As part of the regular Daily Morning Inspection, FE-1 Samokutyayev performed the routine checkup of the SM (Service Module) PSS Caution & Warning panel.

CDR Borisenko completed the daily routine inspection of the recently activated Russian BIO-5 Rasteniya-2 (“Plants-2”) payload with its LADA-01 greenhouse, checking for proper fan operation by testing the air flow from the ventilators BO A04 & BO A05 and verifying that both LEDs (Light Emitting Diodes) are lit. [Rasteniya-2 researches growth and development of plants (currently wheat) under spaceflight conditions in the LADA greenhouse from IBMP (Institute of Bio-Medical Problems, Russian: IMBP).]

FE-4 Volkov conducted the routine daily servicing of the SOZh system (Environment Control & Life Support System, ECLSS) in the SM, including the weekly collection of the toilet flush (SP) counter and water supply (SVO) readings for calldown to TsUP-Moscow. [SOZh servicing includes checking the ASU toilet facilities, replacement of the KTO & KBO solid waste containers and replacement of EDV-SV waste water and EDV-U urine containers].

For today’s VolSci (Voluntary Weekend Science) activities, FE-3 Garan powered on the European ERB-2 (Erasmus Recording Binocular 2) camera payload, shooting onboard scenes. This started an internal clock in ERB-2 which shut the system down after 80 minutes, at which time Ron again activated the system for another 80 min of 3D video taking, stored on SSC-8 (Station Support Computer 8) laptop for downlink. [The stereoscopic ERB-2 has produced the first live 3-D video images in the 50-year history of spaceflight aboard the ISS for ESA’s Research & Technology Center in the Netherlands.]

CDR, FE-1, FE-3 & FE-5 had their weekly PFCs (Private Family Conferences) via S-band/audio and Ku-band/MS-NetMeeting application (which displays the uplinked ground video on an SSC laptop), Andrey at ~10:20am, Sasha at ~10:50am, Ron at ~12:00pm, Satoshi at ~3:35pm EDT.

The crew worked out with their regular 2-hr physical exercise protocol on the CEVIS cycle ergometer with vibration isolation (FE-5, FE-6), TVIS treadmill with vibration isolation & stabilization (FE-1, FE-4), ARED advanced resistive exercise device (FE-1, FE-3, FE-4, FE-5, FE-6), T2/COLBERT advanced treadmill (CDR, FE-3), and VELO ergometer bike with load trainer (CDR).

No CEO (Crew Earth Observation) targets uplinked for today.

ISS Orbit (as of this morning, 5:40am EDT [= epoch])
Mean altitude – 385.9 km
Apogee height – 394.8 km
Perigee height – 377.1 km
Period — 92.27 min.
Inclination (to Equator) — 51.64 deg
Eccentricity — 0.0013071
Solar Beta Angle — 8.0 deg (magnitude decreasing)
Orbits per 24-hr. day — 15.60
Mean altitude loss in the last 24 hours — 78 m
Revolutions since FGB/Zarya launch (Nov. 98) – 73,218

Significant Events Ahead (all dates Eastern Time and subject to change):
————–Six-crew operations————-
09/07/11 — Soyuz TMA-21/26S undock (11:51pm) — UNDER REVIEW
09/08/11 — Soyuz TMA-21/26S landing (~3:08am) (End of Increment 28) — UNDER REVIEW
————–Three-crew operations————-
09/21/11 — Soyuz TMA-03M/28S launch (9:34pm) – D.Burbank (CDR-30)/A.Shkaplerov/A.Ivanishin — UNDER REVIEW
09/23/11 — Soyuz TMA-03M/28S docking (MRM2) (~10:19pm) — UNDER REVIEW
————–Six-crew operations————-
10/25/11 — Progress M-10M/42P undocking
10/26/11 — Progress M-13M/45P launch
10/28/11 — Progress M-13M/45P docking (DC-1)
11/16/11 — Soyuz TMA-02M/27S undock/landing (End of Increment 29)
————–Three-crew operations————-
11/29/11 — Soyuz TMA-04M/29S launch – O.Kononenko (CDR-31)/A.Kuipers/D.Pettit
12/01/11 — Soyuz TMA-04M/29S docking (MRM1)
————–Six-crew operations—————-
12/26/11 — Progress M-13M/45P undock (a late January 2012?)
12/27/11 — Progress M-14M/46P launch (a late January 2012?)
12/29/11 — Progress M-14M/46P docking (DC-1) (a late January 2012?)
02/29/12 — ATV3 launch readiness
03/05/12 — Progress M-12M/44P undock
03/16/12 — Soyuz TMA-03M/28S undock/landing (End of Increment 30)
————–Three-crew operations————-
03/30/12 — Soyuz TMA-05M/30S launch – G.Padalka (CDR-32)/J.Acaba/K.Volkov
04/01/12 — Soyuz TMA-05M/30S docking (MRM2)
————–Six-crew operations—————-
05/05/12 — 3R Multipurpose Laboratory Module (MLM) w/ERA – launch on Proton (under review)
05/06/12 — Progress M-14M/46P undock
05/07/12 — 3R Multipurpose Laboratory Module (MLM) – docking (under review)
05/16/12 — Soyuz TMA-04M/29S undock/landing (End of Increment 31)
————–Three-crew operations————-
05/29/12 – Soyuz TMA-06M/31S launch – S.Williams (CDR-33)/Y.Malenchenko/A.Hoshide
05/31/12 – Soyuz TMA-06M/31S docking
————–Six-crew operations—————-
09/18/12 — Soyuz TMA-05M/30S undock/landing (End of Increment 32)
————–Three-crew operations————-
10/02/12 — Soyuz TMA-07M/32S launch – K.Ford (CDR-34)/O.Novitskiy/E.Tarelkin
10/04/12 – Soyuz TMA-07M/32S docking
————–Six-crew operations————-
11/16/12 — Soyuz TMA-06M/31S undock/landing (End of Increment 33)
————–Three-crew operations————-
11/30/12 — Soyuz TMA-08M/33S launch – C.Hadfield (CDR-35)/T.Mashburn/R.Romanenko
12/02/12 – Soyuz TMA-08M/33S docking
————–Six-crew operations————-
03/xx/13 — Soyuz TMA-07M/32S undock/landing (End of Increment 34)
————–Three-crew operations————-
03/xx/13 – Soyuz TMA-09M/34S launch – P.Vinogradov (CDR-36)/C.Cassidy/A.Misurkin
03/xx/13 – Soyuz TMA-09M/34S docking
————–Six-crew operations————-
05/xx/13 – Soyuz TMA-08M/33S undock/landing (End of Increment 35)
————–Three-crew operations————-
05/xx/13 – Soyuz TMA-10M/35S launch – M.Suraev (CDR-37)/K.Nyberg/L.Parmitano
05/xx/13 – Soyuz TMA-10M/35S docking
————–Six-crew operations————-
09/xx/13 – Soyuz TMA-09M/34S undock/landing (End of Increment 36)
————–Three-crew operations————-
09/xx/13 – Soyuz TMA-11M/36S launch – M.Hopkins/TBD (CDR-38)/TBD
09/xx/13 – Soyuz TMA-11M/36S docking
————–Six-crew operations————-
11/xx/13 – Soyuz TMA-10M/35S undock/landing (End of Increment 37)
————–Three-crew operations————-
11/xx/13 – Soyuz TMA-12M/37S launch – K.Wakata (CDR-39)/R.Mastracchio/TBD
11/xx/13 – Soyuz TMA-12M/37S docking
————–Six-crew operations————-
03/xx/14 – Soyuz TMA-11M/36S undock/landing (End of Increment 38)
————–Three-crew operations————-

SpaceRef staff editor.