Status Report

NASA ISS On-Orbit Status 2 January 2011

By SpaceRef Editor
January 2, 2011
Filed under , , ,
NASA ISS On-Orbit Status 2 January 2011
http://images.spaceref.com/news/exp26.jpg

All ISS systems continue to function nominally, except those noted previously or below. Sunday – Crew rest day. Ahead: Week 6 of Increment 26.

FE-2 Oleg Skripochka conducted the regular daily early-morning check of the aerosol filters at the Russian Elektron O2 generator which Maxim Suraev had installed on 10/19/09 in gaps between the BZh Liquid Unit and the oxygen outlet pipe (filter FA-K) plus hydrogen outlet pipe (filter FA-V). [Oleg will inspect the filters again before bedtime tonight, currently a daily requirement per plan, with photographs to be taken if the filter packing is discolored.]

At wake-up, CDR Scott Kelly, FE-5 Paolo Nespoli & FE-6 Cady Coleman completed their 4th post-sleep shift session of the Reaction Self Test (Psychomotor Vigilance Self Test on the ISS) protocol. [RST is done twice daily (after wakeup & before bedtime) for 3 days prior to the sleep shift, the day(s) of the sleep shift and 5 days following a sleep shift. The experiment consists of a 5-minute reaction time task that allows crewmembers to monitor the daily effects of fatigue on performance while on ISS. The experiment provides objective feedback on neurobehavioral changes in attention, psychomotor speed, state stability, and impulsivity while on ISS missions, particularly as they relate to changes in circadian rhythms, sleep restrictions, and extended work shifts.]

The six station residents completed the regular weekly three-hour task of thorough cleaning of their home, including COL (Columbus Orbital Laboratory) and Kibo JPM (JEM Pressurized Module). [“Uborka”, usually done on Saturdays, includes removal of food waste products, cleaning of compartments with vacuum cleaner, damp cleaning of the SM (Service Module) dining table, other frequently touched surfaces and surfaces where trash is collected, as well as the sleep stations with a standard cleaning solution; also, fan screens and grilles are cleaned to avoid temperature rises. Special cleaning is also done every 90 days on the HEPA (high-efficiency particulate air) bacteria filters in the Lab.]

As part of the uborka house cleaning, FE-1 Kaleri conducted regular maintenance inspection & cleaning of fan screens in the FGB (TsV2) and Group E fan grills in the SM (VPkhO, FS5, FS6, VP).

Kaleri also performed the routine daily servicing of the SOZh system (Environment Control & Life Support System, ECLSS) in the SM (Service Module), including the weekly collection of the toilet flush (SP) counter and water supply (SVO) readings for calldown to TsUP-Moscow. [Regular daily SOZh maintenance consists, among else, of checking the ASU toilet facilities, replacement of the KTO & KBO solid waste containers and replacement of EDV-SV waste water and EDV-U urine containers.]

Alex’s servicing activities included the periodic checkup of the Russian POTOK-150MK (150 micron) air filter unit of the SM’s SOGS air revitalization subsystem, gathering weekly data on total operating time & “On” durations for reporting to TsUP.

CDR Kelly performed another status check on the MERLIN (Microgravity Experiment Research Locker Incubator) Galley fridge, looking for any internal condensation moisture which would require replacing desiccants. [MERLIN, the Galley fridge, is used for cold storage of crew food and drink. If Scott found moisture, a change-out of the desiccant will be scheduled. Daily checks by the crew are currently required because the ground has lost insight into MERLIN due to issues with the failed ER6 (EXPRESS Rack 6) laptop software load on 12/28. A manual software load by a crewmember will be scheduled for tomorrow. FDS (Fire Detection & Suppression) capabilities for the rack are still in place.]

FE-6 Nespoli unstowed and prepared the equipment for his 2nd suite of sessions with the medical protocol Pro K (Dietary Intake Can Predict and Protect against Changes in Bone Metabolism during Spaceflight and Recovery), with controlled diet and diet logging after the urine pH spot test. Paolo will begin the urine sampling for pH value tomorrow, for a 5-day period.

CDR & FE-5 had their PFCs (Private Family Conferences) via S-band/audio and Ku-band/MS-NetMeeting application (which displays the uplinked ground video on an SSC laptop), Paolo at ~6:35am, Scott at ~10:25am EST.

The crewmembers worked out with their regular 2-hr physical exercise on the CEVIS cycle ergometer with vibration isolation (FE-56, FE-6), TVIS treadmill (FE-1, FE-2, FE-4), ARED advanced resistive exerciser (CDR, FE-4, FE-5, FE-6), T2/COLBERT advanced treadmill (CDR) and VELO ergometer bike with bungee cord load trainer (FE-1, FE-2).

No CEO (Crew Earth Observation) targets uploaded today.

ISS Orbit (as of this morning, 5:12am EST [= epoch])
Mean altitude – 352.0 km
Apogee height – 355.6 km
Perigee height – 348.3 km
Period — 91.58 min.
Inclination (to Equator) — 51.65 deg
Eccentricity — 0.0005451
Solar Beta Angle — -8.6 deg (magnitude increasing)
Orbits per 24-hr. day — 15.72
Mean altitude loss in the last 24 hours – 117 m
Revolutions since FGB/Zarya launch (Nov. 98) – 69,481.

Significant Events Ahead (all dates Eastern Time and subject to change):
————–Six-crew operations————-
01/13/11 — ISS Reboost Pt. 2
01/20/11 — HTV2 launch
01/21/11 — Russian EVA-27
01/24/11 — Progress M-08M/40P undock
01/27/11 — HTV2 berthing (Node-2 zenith)
01/28/11 — Progress M-09M/41P launch
01/31/11 — Progress M-09M/41P docking (DC1)
02/03/11 — STS-133/Discovery launch – 1:37:36 am EST
02/04/11 — STS-133/Discovery docking – ~9:43pm
02/11/11 — STS-133/Discovery undock – 4:42pm
02/13/11 — STS-133/Discovery land (KSC) – ~8:41pm
02/21/11 — Russian EVA-28
02/15/11 — ATV-2 “Johannes Kepler” launch
02/19/11 — Progress M-07M/39P undock
02/24/11 — HTV2 unberthing (Node-2 nadir)
02/26/11 — ATV-2 “Johannes Kepler” docking (SM aft)
03/16/11 — Soyuz TMA-01M/24S undock/landing (End of Increment 26)
————–Three-crew operations————-
03/20/11 — Soyuz TMA-21/26S launch – A. Borisienko (CDR-28)/R.Garan/A.Samokutayev
03/22/11 — Soyuz TMA-21/26S docking (MRM2)
————–Six-crew operations————-
04/01/11 — STS-134/Endeavour (ULF6 – ELC3, AMS-02) launch – ~3:15am — NET
04/26/11 — Progress M-09M/41P undock
04/27/11 — Progress M-10M/42P launch
04/29/11 — Progress M-10M/42P docking (DC1)
05/xx/11 — Russian EVA-29
05/16/11 — Soyuz TMA-20/25S undock/landing (End of Increment 27)
————–Three-crew operations————-
05/30/11 — Soyuz TMA-22/27S launch – M. Fossum (CDR-29)/S. Furukawa/S. Volkov
06/01/11 — Soyuz TMA-22/27S docking (MRM1)
————–Six-crew operations————-
06/04/11 — ATV-2 “Johannes Kepler” undock (SM aft)
06/21/11 — Progress M-11M/43P launch
06/23/11 — Progress M-11M/43P docking (SM aft)
08/29/11 — Progress M-11M/43P undocking
08/30/11 — Progress M-12M/44P launch
09/01/11 — Progress M-12M/44P docking (SM aft)
09/16/11 – Soyuz TMA-21/26S undock/landing (End of Increment 28)
————–Three-crew operations————-
09/30/11 — Soyuz TMA-23/28S launch – D.Burbank (CDR-30)/A.Shkaplerov/A.Ivanishin
10/02/11 – Soyuz TMA-23/28S docking (MRM2)
————–Six-crew operations————-
10/25/11 — Progress M-10M/42P undocking
10/26/11 — Progress M-13M/45P launch
10/28/11 — Progress M-13M/45P docking (DC-1)
11/16/11 — Soyuz TMA-22/27S undock/landing (End of Increment 29)
————–Three-crew operations————-
11/30/11 — Soyuz TMA-24/29S launch – O.Kononenko (CDR-31)/A.Kuipers/D.Pettit
12/02/11 — Soyuz TMA-24/29S docking (MRM1)
————–Six-crew operations—————-
12/??/11 — 3R Multipurpose Laboratory Module (MLM) w/ERA – on Proton.
12/26/11 — Progress M-13M/45P undock
12/27/11 — Progress M-14M/46P launch
12/29/11 — Progress M-14M/46P docking (DC-1)
03/05/12 — Progress M-12M/44P undock
03/16/12 — Soyuz TMA-23/28S undock/landing (End of Increment 30)
————–Three-crew operations————-
03/30/12 — Soyuz TMA-25/30S launch – G.Padalka (CDR-32)/J.Acaba/K.Valkov
04/01/12 — Soyuz TMA-25/30S docking (MRM2)
————–Six-crew operations—————-
05/15/12 — Soyuz TMA-24/29S undock/landing (End of Increment 31)
————–Three-crew operations————-
05/29/12 – Soyuz TMA-26/31S launch – S.Williams (CDR-33)/Y.Malenchenko/A.Hoshide
05/31/12 – Soyuz TMA-26/31S docking
————–Six-crew operations—————-
09/09/12 — Soyuz TMA-25/30S undock/landing (End of Increment 32)
————–Three-crew operations————-
09/23/12 — Soyuz TMA-27/32S launch – K.Ford (CDR-34)/O. Novitskiy/E.Tarelkin
09/25/12 – Soyuz TMA-27/32S docking
————–Six-crew operations————-
10/07/12 — Soyuz TMA-26/31S undock/landing (End of Increment 33)
————–Three-crew operations————-
11/xx/12 — Soyuz TMA-28/33S launch – C.Hadfield (CDR-35)/T.Mashburn/R.Romanenko
11/xx/12 – Soyuz TMA-28/33S docking
————–Six-crew operations————-
03/xx/12 — Soyuz TMA-27/32S undock/landing (End of Increment 34)
————–Three-crew operations————-
03/xx/12 – Soyuz TMA-29/34S launch.
03/xx/12 – Soyuz TMA-29/34S docking
————–Six-crew operations————-