Status Report

ISS Panel Report, Integrated Space Operations Summit

By SpaceRef Editor
April 4, 2005
Filed under , , ,
ISS Panel Report, Integrated Space Operations Summit
cabana.jpg

ISS Panel Report, Integrated Space Operations Summit

March 30, 2005

Robert D. Cabana, ISS Panel Chair

Download 4.4 MB Powerpoint Document


— Excerpts —


Findings

  • Based on current requirements, the cargo vehicle flight rate after Shuttle retirement does not meet the projected re-supply and return needs of ISS
  • – Requirements are being reviewed on a continual basis

    • Exploration requirements are scheduled to be defined in the Spring of 2005
    • When released, impact to manifest will be evaluated

  • Requirement reductions alone will not eliminate the transportation shortfall; additional transportation capabilities will be required


Summary

  • With retirement of the Shuttle, the ISS faces a transportation shortfall based on current requirements
    • The ISS Program should continue to pursue cost effective means to reduce the maintenance/logistics requirements for ISS
    • Science requirements for the ISS are being evaluated based on the Vision for Space Exploration and the restricted transportation capabilities

  • The ISS Program should continue to pursue alternate means to deliver cargo to and from the ISS
    • Incorporating all reasonable projections of reductions of transportation requirements still leaves a shortfall

  • Exploration systems should pursue the use of the ISS as an engineering/science test bed to develop and prove the systems and crew health measures required for exploration beyond low Earth orbit


Click on image to enlarge



SpaceRef staff editor.